The ProfitDig Radio Show
Practical talk for excavation and sitework contractors and estimators. Bid smarter, run the numbers, and keep more of what you earn.
The ProfitDig Radio Show is a straight conversation about the work and the business behind it. We talk through real jobsite situations, estimating and job costing, cash flow, equipment decisions, and the problems that show up when you are running crews and trying to make a profit.
If you dig, estimate, or run a sitework or excavation company, this show is for you. You will hear from the ProfitDig team and from contractors who do this work every day. No fluff. Just practical talk you can use on the next bid or the next job.
New episodes come out every week.
Learn more about ProfitDig, easy job bidding and costing for construction contractors, at https://profitdig.com
If the show helps you, follow it and leave a rating. That is the best way to help other contractors find it.
The ProfitDig Radio Show
Job Bidding in Times of High Demand and Low Supply: ProfitDig Radio Show Episode 15
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
Jeff Spencer and Chris Work talk about construction job bidding in these difficult times. The construction industry in Middle Tennessee, where ProfitDig is located, is booming. However, a lack of workers and rapidly rising materials costs are placing extreme pressure on many contractors.
Jeff has been a professional project manager for many years, and he has seen it all. So he talks about some strategies for bidding jobs when demand is very high, like it is now. He also gives some advice about renting equipment when you don't have what you need for certain jobs.
The men also discuss when to stockpile materials. Jeff talks about how his business is currently experiencing shortages and wait times of four to six weeks to get materials.
Another topic discussed is making sure you have a firm understanding of the mobilization that will be required for a job. If you do not have a firm understanding of how and when you are going to have to move your equipment, it could have severe negative consequences to your profitability.
Listen in as a seasoned professional dishes out some of this best advice for bidding jobs in times of high demand and low supply.
From ProfitDig - easy, low cost construction job bidding, costing and reporting.
The Prophet Dig Radio Show.
SPEAKER_01Hey guys, welcome to the Prophet Dig Radio Show. I'm Chris Wark. I'm here with Jeff Spencer.
SPEAKER_02How's it going, Chris?
SPEAKER_01Going well. How are you doing?
SPEAKER_02Doing well.
SPEAKER_01Excellent, excellent. Uh guys, we appreciate it if you would subscribe to the channel. We're starting to produce more and more content and leave us some comments. Let us know if there's something, uh, specific topic, questions you'd like to talk about. We would love that. Um feel free to again drop it in the comments and let us know, and we'll put something together for you. Jeff, hot topic. Everybody's getting back to work, thank goodness. Um, which construction's been back to work, but now it seems like everybody is getting back to work. At least I hope so, you know. Yeah. That unemployment gets easy sometimes. Um you're bidding like crazy.
SPEAKER_02Yeah.
SPEAKER_01You, your competitors, your uh, your subcontractors, everybody. Everybody's busy.
SPEAKER_02Everybody's bidding. A lot of work out to bid right now in our area.
SPEAKER_01Yeah.
SPEAKER_02And it's uh probably more work to bid right now than I've seen in the last three years.
SPEAKER_01That's fantastic.
SPEAKER_02Yeah.
SPEAKER_01So for obviously users of our application, Profit Dig, and folks who just check us out on YouTube, what are some tips do you have when bidding on a project in this environment today?
SPEAKER_02Well, you know, it's if you're in a busy market like we are, you can kind of pick and choose, you know, between your projects, what best fit your scope of work, uh, areas you like to work in, and also, you know, monetary value. You know, you can look at jobs and you can kind of when you're in a competitive market, you can put a little more money in your projects. You know, don't be scared because we're we're bidding so many right now at such a fast pace, you know. So what if we bid 100 projects, you know, in a month and have two months time and you pick up one or two jobs out of those, you know that you've got good potential profit margin ahead of you. Well,
SPEAKER_01that's fantastic. And and you don't want to win them all. No,
SPEAKER_02you don't want to win them. No, uh and like I said up before, you know, 10, 12 percent, you know, somewhere in that area is what you want to win your in your bid proposals. You know, if you're bidding, you know, 20 jobs a week, then or 20 jobs a month, whatever it may be, then you know you want to pick up you know one or two jobs out of those 20.
SPEAKER_01Right. And so are you so are you afforded a little bit of luxury right now since the market is so hot that you can, like you said, you can sort of pick or choose. Yeah, you can
SPEAKER_02pick or choose. You know, you can put a little more money in there, you know, especially when you've got a good backlog, you know, you've got work ahead, you know, don't don't be afraid to up your prices. You know, it's uh don't outbid your workforce. So but you know, and what I mean by that is like if you've got X amount of crews available, you know, don't get to the point to where your crews are struggling to man the jobs.
SPEAKER_01Right.
SPEAKER_02Put the put the money in your projects, you know, to where you're not gonna get so many of them.
SPEAKER_01Yeah, but it's hard to build a crew, right?
SPEAKER_02Yeah, it is. I mean, they're they're
SPEAKER_01not sitting around with nothing to do. No, and
SPEAKER_02especially when the government's paying you more to be unemployed is to be employed, yeah.
SPEAKER_01Yeah. Yeah.
SPEAKER_02So, you know, don't don't be afraid if you got a good backlog and and and plenty of work on books, don't be afraid to throw some extra money in there because there's a good chance, you know, you're still gonna end up with a decent percentage of what you're bidding.
SPEAKER_01Right. That's fantastic.
SPEAKER_02Oh
SPEAKER_01well, what about uh um you say put more money into it? Are we talking into labor, material, equipment, or a little bit of everything? Just sort of depends.
SPEAKER_02I would up my pricing a little bit, my my percentage on my materials. You know, like I I charge X amount of dollars over the cost of my materials.
SPEAKER_01Yeah.
SPEAKER_02So your profit margin normally runs at 15%, but you know, up at the 20%.
SPEAKER_01Sure. Just sweep it. You're saying just yet.
SPEAKER_02And if you do like a 5%, you know, miscellaneous or contingency money in your projects, you know, don't be afraid to up that to seven, eight, ten percent, you know.
SPEAKER_01Yeah
SPEAKER_02uh get a job that's inflated, and then don't be afraid to negotiate. You know, if someone calls you and like, hey, I really want you to do this project, but you're a little bit higher than my competitor, you know, have a little bit of negotiating room.
SPEAKER_01Yeah, yeah, have a little flexibility.
SPEAKER_02Go ahead and when you when you present that bid, go ahead and have a magic number written down there.
SPEAKER_01Yeah.
SPEAKER_02So if if you have a uh a contractor that calls you back and says, hey, you know, I want you to do this project, but I need a little more money back. Have a bottom dollar that you feel comfortable with or you can still make above and beyond what you normally make.
SPEAKER_01Yeah. Be prepared.
SPEAKER_02Be prepared.
SPEAKER_01Yeah.
SPEAKER_02And uh, you know, don't don't be don't be afraid to go into negotiations in this in today's market because if you do quality work, they're gonna want you.
SPEAKER_01Right.
SPEAKER_02Especially if you can get in and get out with your cruise sizes, if you can man the job on time, get in, do them a good job, and get out in a timely fashion,
SPEAKER_01yeah,
SPEAKER_02you're making them money. And you're making yourself money.
SPEAKER_01Yeah.
SPEAKER_02So, you know, they wouldn't be calling you if they didn't really didn't want you to do the project.
SPEAKER_01Right, right. Is there a secret sauce to that in terms of, you know, I'm a contractor and I'm saying, okay, the market's booming. I'm probably cutting my throat a little. It's time to put a little more money in these jobs. We're busy. Is there any secret sauce to where I put that money in the job? I mean, is is does that does that vary by market, by uh vendor of material? I mean, if I'm a guy who buys a new komatsu on the west coast and I'm or on the east coast, am I paying? Is there a you know a big difference in price based on my location and does that impact how much I'm charging for that equipment? It
SPEAKER_02could be, you know, it's gonna be based on the market in your area.
SPEAKER_01Sure.
SPEAKER_02So, you know, if you're got a booming market like we do right here now in Middle Tennessee, then yeah, I mean, all prices go up. So whether it be materials, whether it be equipment, you know, whatever it may be, you know, supply and demand plays a big role in that.
SPEAKER_01Yeah.
SPEAKER_02And especially if you're renting your equipment, rental rates go up because they've only got X number of units that they can rent out, you know.
SPEAKER_01Yeah. Supply and demand.
SPEAKER_02Supply and demand. So, you know, you've got to be, you know, take that into effect that, you know, hey, when this job comes about, I may have to pay a higher rental rate because the market's booming right now.
SPEAKER_01Yeah.
SPEAKER_02If I can get the machine. If you can't get the machine, you're gonna have to, you know, hunker down and make a purchase.
SPEAKER_01Or,
SPEAKER_02you know, we talked about before, RPOs, real purchase orders.
SPEAKER_01Right.
SPEAKER_02I'm a firm believer, if you've got a project that's gonna last six months or longer and you're gonna have to rent equipment, go ahead and set up an RPO. No harm, no foul. You know, six months. Six months down the road, if you don't have anywhere to move that piece of equipment, you can get out of the contract with no penalties.
SPEAKER_01Okay.
SPEAKER_02That machine, you know, you haven't financed it for five years or anything else, that machine can go back, they can rent it out to someone else. But if you need that machine on another job, you've got an RPO for just say nine months. Well, most equipment dealers right now are offering like 90 to 100 percent of whatever you pay in rental rate to go towards the purchase of that machine.
SPEAKER_01Right.
SPEAKER_02And so why not take advantage of it?
SPEAKER_01Sure.
SPEAKER_02I finished up this project, I'm going to the next project, I'm gonna keep renting this machine. Nine months down the road, I've got $35,000, $40,000 into this just say $250,000 piece of machinery. Well, now I can purchase it, you know, at roughly $180,000, $190,000.
SPEAKER_01Yeah.
SPEAKER_02Because 100% of what I paid in is going towards a purchase.
SPEAKER_01Right.
SPEAKER_02Take advantage of it. That machine, you know how it's been treated because you've owned it from the time it was new.
SPEAKER_01That's right. And they're maintaining it during this period, right? Yes. Yeah.
SPEAKER_02And so take advantage of that. You know, end up with a piece of machinery that's going to raise the value of your company because you now own this machine.
SPEAKER_01Right.
SPEAKER_02And even as an RPO, at that point, it's considered as a machine that you're owning because you are renting it to purchase until you turn it in. So, you know, I mean, you've got, you know, taxization that you can levy on, you know, at the end of the year.
SPEAKER_01Right.
SPEAKER_02So take advantage of it.
SPEAKER_01Yeah, that's good advice. And I guess I'm paying insurance on this with an RPO, right? Yes. And that's a good point. Yeah.
SPEAKER_02Always, when you rent a piece of equipment, whether it's straight-out rental or RPO, always use your own insurance company because when you go through the the rental companies, they're inflated rates.
SPEAKER_01I bet.
SPEAKER_02Major inflated rates. I mean, you're going to be paying probably extra three to five hundred dollars a month on average for their insurance where pennies on a dollar, you could have it on yours.
SPEAKER_01Yeah. And I I guess it works like a car, right? I mean, is it just based on the value of the equipment?
SPEAKER_02Yes, based on, you know, so many hours, it's based on the value of the equipment, how many hours you run it.
SPEAKER_01Okay.
SPEAKER_02Uh and you know, the way they're set up, they're you know, most rental, just straight out rentals based on weekly, bi-monthly, and monthly. Well, anytime you hit that three-week mark, it automatically rolls to the monthly rate.
SPEAKER_01So
SPEAKER_02if you only need a machine for three weeks, you're gonna pay a monthly rate. So try to find somewhere to use that machine for the extra, you know, four weeks or the extra week, you know, to make a full four weeks rental rate.
SPEAKER_01Yeah.
SPEAKER_02Uh but you know, if you're looking at decent-sized projects gonna last three, four, or five months and longer, look at RPOs. That's the way to go.
SPEAKER_01The way to go, yeah. Yeah,
SPEAKER_02and you're gonna do that. That way you're not tying up your bank, you know, you still got your money to operate on, and it's just like a rental piece of equipment. You're paying normal rental rates base per month, but all that's going towards your purchase. You're actually buying a brand new machine that's you know 20% off.
SPEAKER_01Right. Yeah. Why
SPEAKER_02not go ahead and make a purchase at the end of nine months?
SPEAKER_01That makes total sense. Well, that's good advice. Changing directions. Sort of. You've talked about uh at times when material prices are down, and if you have places to store them, you'll go in and while you have a really good price on it, you'll go ahead and buy it up for future jobs and store it somewhere. Is there any if as if material prices are climbing, is there do you ever do any purchases there in anticipation that the prices are going to continue going up?
SPEAKER_02Well, right now is a good good time to ask that question. Because based off the storms and stuff they've had, and what I've been hearing in in Texas and Houston, the resin plants have been shut down and we're having trouble getting PVC pipe. It's also projected into duckle iron pipe. Uh so if you're in a pipe business, you know, right now is a time to look at you know and make decisions. Our suppliers are telling us, you know, that we're anywhere from four to eight weeks out. If we order materials,
SPEAKER_01we're
SPEAKER_02getting them because there's such a a uh supply supply and demand crisis.
SPEAKER_01Yeah.
SPEAKER_02Because there's not enough pipe to go around. And I talked to some of my material suppliers in the last few weeks saying that they're like you're Joe Blow. You don't deal with this pipe company A very often. You call them up and say, hey, I need to get X amount of number of pipe. They won't even deal with you if you're not a regular customer.
SPEAKER_01Really?
SPEAKER_02They're trying to save our product for their regular customers.
SPEAKER_01That makes sense. Yeah.
SPEAKER_02And when the market's up, which pipe's up right now, I would hate to say stockpile on it, but it's been on a steady incline for the last couple months. It's going to turn around, but I don't know when that's going to be.
SPEAKER_01Right.
SPEAKER_02Because if you
SPEAKER_01got jobs on the books that are ready to start, it makes sense.
SPEAKER_02Yeah. Go ahead and buy it up and supply it. The only catch is when you got PVC pipe, it's got a birth date on it when they when they manufacture it. Sunlight fades out PVC pipe. Also makes it brittle. So you need to have a shedded area or tarp it to store it. And, you know, tarps, you know, I mean, grand scheme of thing, you go out and spend two or three hundred dollars in tarps to tarp your stockpile, it's gonna be worth it in the long run.
SPEAKER_01Yeah.
SPEAKER_02Uh but the thing is, you know, put your orders in now, get your pipe. You know, majority of our pipe is four inch, six inch, eight inch, and ten inch.
SPEAKER_01Okay.
SPEAKER_02So right now, I wouldn't be it it would be in our wheelhouse to go ahead and order a couple thousand feet of each one and have them on hand.
SPEAKER_01Just to have it.
SPEAKER_02Yeah. Because some of these projects that we're bidding right now are fast-paced product projects. So if I tell them there's a six to eight week leeway on on pipe delivery, you know, there's good good possibility, you know, it's gonna be some repercussion on the tail end of that.
SPEAKER_01Yeah. Except for the contractor who has to be sitting on a little extra pipe right there. Exactly. Yeah. Yeah. Therefore, he he can put even more into that job because this damn job has to get done. Right, exactly. And he has material. So
SPEAKER_02And I even got a call today saying that you know now there's gonna be uh from one supplier, now not all suppliers, but one supplier called me today, like, hey, if you're gonna need MJ fittings, you need to go ahead and and start stockpiling them because there's gonna be shortage here in the future, near future.
SPEAKER_01Really?
SPEAKER_02Yeah, gonna be tough to get.
SPEAKER_01Gosh. And that's that could be scary.
SPEAKER_02Yeah.
SPEAKER_01I mean, underground is quite important.
SPEAKER_02Yeah.
SPEAKER_01You can't build
SPEAKER_02without infrastructure.
SPEAKER_01Without infrastructure. Yeah. So that I mean that could halt everything.
SPEAKER_02You can build the nicest building in the world, but if you don't have water or sanitary sewer to support it, then you can occupy it.
SPEAKER_01That's right. Yeah. Yeah. Yeah. I don't think anybody would want to be in there anyway. No. Can't use the restrooms. That's interesting.
SPEAKER_02Right, back in the 1920s.
SPEAKER_01Right. All right. So we've talked about putting money in our jobs. Uh anything. I mean, I guess it doesn't have to be based on today's, you know, financial climate or environment. Is uh any any other tips in the bid process you'd like to share on the other side of the money?
SPEAKER_02Well, I mean, you can get into a lot of different aspects, you know, from start to finish.
SPEAKER_01Sure.
SPEAKER_02Uh but you know, when you've got plenty of work, you can pick and choose the jobs you're interested in, the ones that's going to make you the most money. And, you know, if you've got someone, unless it's a regular client that calls you up and say, I need a price on this in four days or five days, you know, if you're booked up, you know, don't give in to someone you don't normally bid to.
SPEAKER_01Sure.
SPEAKER_02You know, if it's a regular customer, you know, try to try to work them in and get them a good price. But there's a lot of leg work. You know, when you look at a project, you know, you need to do your leg work. You need to go out and look at the actual site,
SPEAKER_01sure.
SPEAKER_02Whether it's started or not, and figure out, you know, what what you got to do to get that price together. Figure out, you know, what the situation you're gonna be to mobilize,
SPEAKER_01you know,
SPEAKER_02is it in town, is it out of town, you know, in a rural area, you know, how many mobilizations you gotta make, you know, a lot of key points you gotta before you ever even start the bid process. Uh because if you don't figure in mobilization and what it's gonna cost you to mobilize one time, two times, or even up to ten times on a single project, because if you're in a downtown area, you gotta pull in, do a certain amount of work, pull out. They get so far along, you gotta pull back in and do something else, pull out. So, you know, you you can you can mobilize eight or ten times pretty easy on one project depending on the size of it. So if you don't figure that in, you know, sometimes it can be like three, four thousand dollars per mobilization. Depending on how many pieces of equipment you got.
SPEAKER_01Really?
SPEAKER_02Yeah.
SPEAKER_01Gosh, yeah. So if it's a if it's a smaller project, that could make or break a deal.
SPEAKER_02Yeah. So, you know, it's and even if you if you have your own low boy and access, you know, to move your own equipment, that still costs you something.
SPEAKER_01Absolutely.
SPEAKER_02So, you know, you gotta figure in, you know, just like if you was gonna hire somebody to move you in, you need to be charging those same rates.
SPEAKER_01Yeah.
SPEAKER_02Because you want to make money off of it too.
SPEAKER_01That's right. You're you're paying the driver, the fuel, taking care of everything.
SPEAKER_02Yeah. And then, you know, the whole bidding process goes into again, location,
SPEAKER_01right,
SPEAKER_02multiple trades, what's production gonna be? You've got to figure that out.
SPEAKER_01Right.
SPEAKER_02You gotta figure out, you know, what crews you have available. This crew's gonna get the most production, this crew's gonna get the least production, and when I'm bidding a project, I'm gonna take a medium of the two crews, my worst crew, my best crew. That way, no matter what crew I send out there, I'm gonna be covered in that process. Hopefully, gonna be covered.
SPEAKER_01Hopefully, yeah. Yeah, that that's the thing.
SPEAKER_02There's a lot of unforeseen, you know, and especially when you're working in a downtown area,
SPEAKER_01you
SPEAKER_02know, you've got to be prepared for the unforeseen.
SPEAKER_01Oh, absolutely. And if you're a new guy and and you make a mistake there, that's okay. As long as you recognize that you made that big mistake and correct it on your next one. You know, I mean, nobody's perfect, you know. It takes it's a learning curve, sure.
SPEAKER_02When you're a new guy, depending on the consequences of that mistake,
SPEAKER_01may
SPEAKER_02determine if you get to bid another job
SPEAKER_01or not. That's true. Yeah. That's true. Yeah.
SPEAKER_02So, you know, it's really very important to do your legwork up front and and you know, don't just throw numbers at a job based off of what somebody else says it's worth.
SPEAKER_01Right.
SPEAKER_02You know, you do you crunching numbers, you own the business, make sure that you are comfortable with the numbers you're turning in.
SPEAKER_01Sure.
SPEAKER_02Because at the end of the day, you're the one flipping the bill, you're the one on the line. If you can't make that project happen and it costs you more money than what you've got in it,
SPEAKER_01yeah,
SPEAKER_02then there's a pretty good chance you're not going to survive for the next job.
SPEAKER_01Right. Personal question. You ever heard through the grapevine what some contract uh other contractor might be bidding on a project you're bidding on? I mean, I doubt that some that would happen. Yeah, yeah. Frequency, but
SPEAKER_02and you know, and a lot of public bids, you know, like whenever
SPEAKER_01Well, okay, sure. A public bid.
SPEAKER_02Yeah, like public bids, you know, it's it's open to the public. So when you pick up a bid package or purchase a bid package, then they give you a list of GCs that are bidding on that project against you.
SPEAKER_01Okay.
SPEAKER_02And so there again, it's just a it's a competitive market. So you kind of know, if you bid against these people on a regular basis, you kind of know where they're at.
SPEAKER_01Right.
SPEAKER_02Because you get a bid sheet, a bid tabulation sheet, it shows where they're at per bid item.
SPEAKER_01Yeah.
SPEAKER_02And so that gives you an idea. If I'm bidding against this guy, hey, I know what he's done in the past. But there again, you know, there's always there there's a game to all of it.
SPEAKER_01Sure. Because there wouldn't there wouldn't be any advantage to them bidding down some of these numbers on on jobs that are available to the public, is there? Because I mean, wouldn't they just be bringing the whole market down with them? Or
SPEAKER_02uh you know, I heard a long time ago that
SPEAKER_01or are they manipulating it somehow, you know,
SPEAKER_02there there is a manipulation point to it. But I was told a long time ago, you know, always look at jobs that are a million dollars plus. Because you're gonna weed out all these smaller contractors that can't be bonded
SPEAKER_01for that
SPEAKER_02amount.
SPEAKER_01Yeah. Yeah.
SPEAKER_02Because they they truly haven't done a background check on what it costs them to operate.
SPEAKER_01Right.
SPEAKER_02So they go in and undercut everybody else, they get these jobs and they can't get change orders and they go belly up and and so on and so forth. But when you're looking at million plus dollar jobs, then you kind of weed them out. You know, you're looking at more competitive, more established type contractors that's going to see the bigger picture.
SPEAKER_01Yeah. Is there like a psychological component to that of saying your competitor's number? Do you like that, dislike that? Does that make you start rethinking your strategy or how you would bid something? In in a negative fashion, I guess. It does.
SPEAKER_02And you know, a lot of times, you know, if I'm going to public bid opening, you know, a lot of times I'll sit in my vehicle to the last minute and watch and see who shows up. And then, like, you know, have Joe Blow over here, you know, he's always low. And I look at my price, you know, I may go back and alter a few line items, you know, and lower my price a bit, you know, and run a few calculations and make sure I can still make money off of it.
SPEAKER_01Right.
SPEAKER_02And but, you know, it's and and and to do that, you know, we used to old school, you could do pencil in versions. Well, nowadays, you know, when you have a public open, it has to be in pen.
SPEAKER_01Sure.
SPEAKER_02So I may have three or four bid packages that I've got copied off, and I may go through and rewrite them.
SPEAKER_01Mm-hmm.
SPEAKER_02Depending on how big the jobs are, but I may rewrite them, you know, based off who's showing up for the bid.
SPEAKER_01I got you. Okay.
SPEAKER_02And you don't always know that because a lot of them can be mailed in. So you may have 20 bidders and three show up, but here's 17 more that got mailed in. Amen,
SPEAKER_01yeah. So you don't know what's going on. So you don't really know what's going on yet. Yeah.
SPEAKER_02But I guess
SPEAKER_01once they once they select their contractor, I mean you're privy to everyone's bids and everything. Oh, yeah.
SPEAKER_02That's that's the point of being a public bid owner.
SPEAKER_01I got you. I got you.
SPEAKER_02Anything that's funded by the government, which is taxpayer dollars, it has to be public knowledge.
SPEAKER_01Yeah.
SPEAKER_02And once the bid's over with, that's when they send out bid tabulations. And it shows you the unit prices of what the bidders are, what they bid on, and it can kind of help you to focus on and base on future bids based off those unit prices of the low bidder.
SPEAKER_01Gotcha. Well, Jeff, awesome info. We're gonna wrap. Um appreciate your time. Yes,
SPEAKER_02sir.
SPEAKER_01Thank you for checking out the Prophet Dig Radio Show. We hope to see you again. You can uh follow us, subscribe, leave us a comment, give us some topics. We'd love to discuss it with you.