Practical talk for excavation and sitework contractors and estimators. Bid smarter, run the numbers, and keep more of what you earn.
The ProfitDig Radio Show is a straight conversation about the work and the business behind it. We talk through real jobsite situations, estimating and job costing, cash flow, equipment decisions, and the problems that show up when you are running crews and trying to make a profit.
If you dig, estimate, or run a sitework or excavation company, this show is for you. You will hear from the ProfitDig team and from contractors who do this work every day. No fluff. Just practical talk you can use on the next bid or the next job.
New episodes come out every week.
Learn more about ProfitDig, easy job bidding and costing for construction contractors, at https://profitdig.com
If the show helps you, follow it and leave a rating. That is the best way to help other contractors find it.
Getting Started in the Excavation Biz: Trouble Finding Workers & Equipment
•ProfitDig LLC
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
0:00
|
9:26
Luke Fielder is a new excavation company owner currently running a three-man crew. In this second part of our interview with Luke, he talks about some of the jobs he is working on, the problems with trying to find more employees, and the difficulty acquiring the equipment he needs (even rentals) to complete his jobs. He also touches on the fact that his wife plays a critical role in the business by handling paperwork and administrative tasks.
Presented by ProfitDig - an easy, Cloud-based solution for contractor bidding and costing.
And we wasn't able to get uh we wasn't able to get any off-road dump trucks, so we ended up having to hire two road trucks to haul on site just because the availability of equipment is so it it's hard. Yeah.
SPEAKER_01
Right
SPEAKER_00
now there's it's few and far between being able to get the equipment that you actually need.
SPEAKER_02
Well look, how big is your crew that you operate?
SPEAKER_00
Uh right now, including me, three people.
SPEAKER_02
Three guys?
SPEAKER_00
Yeah, I've had yeah, I've had uh I had to let some people go, some people left, and but yeah, ideally um I like to have on a on a grading job four to five guys. Uh at least a tracco operator, dozer operator. If we're in the middle of a mass production phase of it, two truck drivers, and then I'll run the roller or whatever just needs to be done. But right now, like we're in the finishing phase of this job that we're on. Um we're getting our subgrid ready to put stone down on a big parking lot. Um but I mean we're chugging along great. I got a great dozer operator helping me right now. I'm actually uh trying to recruit him to come over and work for me full-time to be able to eventually step up and run a run a crew of his own to where I can start building up another crew and then eventually
SPEAKER_01
move
SPEAKER_00
up from there. Oh
SPEAKER_01
well, sorry. Let me interrupt something that caught me off guard is you're already dealing with retention. Oh,
SPEAKER_00
yeah.
SPEAKER_01
Guys wanting to vote
SPEAKER_00
for
SPEAKER_01
some something else and we're five months into the starting this new company.
SPEAKER_00
Yeah. Um
SPEAKER_01
environment that was working in here in construction.
SPEAKER_00
Yeah, yeah, yeah. And it is a it's a task to get um to get good workers. Um, you know, like one of the guys that that quit, he uh he had some health issues, and that was that was his reason for leaving.
SPEAKER_01
Well
SPEAKER_00
uh the last guy I had uh quit was because it was um it was too hot and he couldn't breathe running an open cab roller, you know. So I mean there's there's those issue those types of issues too.
SPEAKER_01
And this is someone who's been in this line of work?
SPEAKER_00
I he claimed he had. He had only been there for three days.
SPEAKER_02
Yeah. I
SPEAKER_01
got it.
SPEAKER_00
Yeah, there's uh, you know, you have those issues as well.
SPEAKER_01
Yeah.
SPEAKER_00
But um, but yeah, I I originally started off with uh just three guys helping me. Um and we wasn't able to get um we weren't able to get any off-road dump trucks, so we ended up having to hire two road trucks to haul on site just because the availability of equipment is so it it's hard
SPEAKER_01
right
SPEAKER_00
now. There's it's few and far between being able to get the equipment that you actually need.
SPEAKER_02
Just for the rails?
SPEAKER_00
Yeah. Yeah. Yeah, we got very lucky actually. Um we've had uh like a bigger size dozer, like I said, the D65 Komatsu. Um and so now we're at the phase of the job where we need a smaller finish dozer. And um, like I said, we got really lucky they found one and actually had to send it in from Indiana.
SPEAKER_02
Uh
SPEAKER_00
and they was they was able to get it to us today, finally. But yeah, and and and rollers, like you would think rollers would be not that big of a deal, but it it took them a while to find a roller for us too.
SPEAKER_02
You think that's just because of so much business going on around the Nashville area right now?
SPEAKER_00
Absolutely, yeah. It's just so busy around Middle Tennessee that the availability for it is ridiculous. Yeah,
SPEAKER_01
well I guess you guys are the first to cite on some new development, right? So
SPEAKER_00
yeah.
SPEAKER_01
So um,
SPEAKER_00
yeah.
SPEAKER_02
So you do the clearing, then get it over here. Yeah, we
SPEAKER_00
yeah, we'll we'll start off with uh um clearing trees, dripping topsoil, um, you know, from the ground up, very first phase
SPEAKER_01
to
SPEAKER_00
the very end.
SPEAKER_01
That's cool.
SPEAKER_00
We actually had a bunch of excess material on the job that we're on right now that uh got pushed off and just filled a like a holler ravine in from the last phase, and so we had to deal with that. So we're having to haul a bunch off-site now.
SPEAKER_02
Did dig it out of that?
SPEAKER_00
Yeah, yeah, we had to get it out of the way. That way we get something down to down to something where we could actually build on that would be structural.
SPEAKER_01
No, you said material. We're talking scrap, or we're talking about materials that could be
SPEAKER_00
a little bit more than a little bit of a little bit of a little bit of a little bit of
SPEAKER_01
a
SPEAKER_00
material dirt for you. Like planting materials.
SPEAKER_01
Okay, okay, I'm sorry.
SPEAKER_00
Yeah, you know, so we had to. I was like,
SPEAKER_01
wait a minute, the hell's pushing pipe off.
SPEAKER_00
Right?
SPEAKER_02
It wouldn't have
SPEAKER_00
been a surprise if you know if we hadn't dug some of that up. There was, you know, ash, old tree stumps, and logs and stuff that hadn't been burned up and yeah, old red dirt that they couldn't use on the other site or on the other phase that we uh yeah we had to having to get rid of you know different ways. But I think we ended up with a total of like 450 loads of topsoil, and we'll probably only need about a hundred on the site that we're on right now after we're all said and done. So
SPEAKER_02
you plan on keeping that somewhere else? Yeah,
SPEAKER_00
it's actually for sale.
SPEAKER_02
Yeah, so anybody interested in buying any
SPEAKER_00
topsoil, give me a call.
SPEAKER_01
Yeah, yeah. Yeah.
SPEAKER_00
Yep.
SPEAKER_01
Now you uh do you guys do any sewer work, drainage work, anything like that as well, or you just
SPEAKER_00
so uh as far as uh underground utilities, not really. Um we mainly focus on uh just the grading part. Like we do have to lay like a little bit of uh sanitary storm,
SPEAKER_01
which
SPEAKER_00
is just you know drain pipe. Um we gotta put in like a uh catch basin in the middle of a ditch that goes underneath the road coming over to this new phase with a head wall on the end of it, and then there's a retention pond that we gotta set a head wall uh with a pipe leaving it.
SPEAKER_01
Okay, and
SPEAKER_00
that's that's about it. I think there's a little bit of electric, but as far as anything like any kind of sewage or you know anything like that, we I I typically try to stay away from that, like sewerage, water, or anything.
SPEAKER_01
Yeah, dying, yeah.
SPEAKER_00
Any kind of pressurized storm or any kind of pressurized line.
SPEAKER_01
Yeah. Well, I can't believe it. My next question was gonna be have you faced any of these material shortages and things like that, but it's maybe not. Not
SPEAKER_00
yet. Not yet. Um, just for the little bit that we have encountered. Um and even in future phases, we when we do come upon, you know, like you said, uh sewer or water. I I'm I'll get a subcontractor that can deal with that headache.
SPEAKER_01
I got you. Yeah.
SPEAKER_03
I'd I'd be curious. See, I got me a mic now, too. This is Jack. Professionals around here.
SPEAKER_01
I like it. Um
SPEAKER_03
talk a little more like about just the philosophy of getting started and how you did it. Like, that's very clever where you're a subcontractor, but your contractor is actually owns the equipment. Like, that's a that was that's like a creative solution for launching your business with limited capital, you know. Just stuff like that. Like, and you thought about working with your wife, and she's helping you, all that kind of stuff.
SPEAKER_00
Yeah, um, yeah, so my wife, she's she's definitely helped out a ton uh just so I can have my undivided attention to the field. Um, because not only the field area, there's also a ton of paperwork at the end at the end of each day as well. You know, I mean we turn in uh weekly invoices, and for every day that we work, I'll turn in a timesheet to her. That way she'll have pretty much a script to write out uh to fill out our weekly invoices, because even on the invoices, we have to give in a daily subs uh description of what was completed on that day. And uh so she really really helps out with that, and she's also a lot more computer savvy than I am, and so that that definitely helps. Um but uh but not only that, you know, there's also you know the the tax stuff that you gotta fill out and get turned in, and um insurance uh is a is a big key factor. I mean there's a lot that goes in behind the scenes that it's not even seen that if it wasn't for her, there's there's no way in hell I could be able to keep up with all of that and be able to keep up with my guys or pick up the slack where I am where I am lacking, you know, from uh having the the right guys in the right position.