Practical talk for excavation and sitework contractors and estimators. Bid smarter, run the numbers, and keep more of what you earn.
The ProfitDig Radio Show is a straight conversation about the work and the business behind it. We talk through real jobsite situations, estimating and job costing, cash flow, equipment decisions, and the problems that show up when you are running crews and trying to make a profit.
If you dig, estimate, or run a sitework or excavation company, this show is for you. You will hear from the ProfitDig team and from contractors who do this work every day. No fluff. Just practical talk you can use on the next bid or the next job.
New episodes come out every week.
Learn more about ProfitDig, easy job bidding and costing for construction contractors, at https://profitdig.com
If the show helps you, follow it and leave a rating. That is the best way to help other contractors find it.
When Is a Construction Project Really Over? The Process of Finalizing a Job.
•ProfitDig LLC
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
0:00
|
10:27
Jeff Spencer explains the process of finalizing a job, what information needs to be conveyed to the client, when your insurance on the job starts and more. He also explains that just finishing a job on time and on budget should not be a reason to celebrate - it should be your expectation. Finally, he talks about the importance of making your crew feel appreciated.
From ProfitDig - easy job bidding for construction contractors.
That's the the local government and everybody signed off on it saying that this building has been built, infrastructure has been put in, per spec, per code, you are now able to use this facility. When they get that release, that is their completion date. So our warranty starts at that date.
SPEAKER_02
It's all running, yo.
SPEAKER_01
It's
SPEAKER_03
all running. Sorry. It's all running.
SPEAKER_02
It's all running. It's all right. Alright, now we can start.
SPEAKER_03
No, okay.
SPEAKER_01
So Jeff Spencer, I just wanted to pick your brain for a minute. Um I was curious about what kind of tasks or you know checklist items you have when you get ready to close out a project. How do you tie up all the loose ends and get ready to completely disconnect from a project and move on either to the next one or multiple projects?
SPEAKER_00
Well, it starts off with you know like punch list items. That you know, the GC or the owner you're working for, and yourself, you know, we'll go through the job as it's closing out, and you'll have punch list items, you know, that adjusting manholes, you know, uh whatever it may be, you know, valve boxes, uh, fire hydrants, you
unknown
know,
SPEAKER_00
what whatever it may be on that project needs to be done at the last, you know, final stages before the final asphalt goes down. Punch list is the main thing, you know, get that done, and then you've got to write your warranty letter. So, you know, standard warranty in Middle Tennessee, you know, for most projects is one year. Uh so I've got to write a warranty letter to the owner, and then as belt drawings. You've got to you have a set of drawings that's given to you by the uh the uh EOR, which is engineer record. You built this project according to their drawings, but you've made some changes along the way. So you want to be able to show footages, locations of items such as manholes, fire hydrants, you want to show you know elevations as far as invert elevations, type of casting, same over grade work. You want to show a finished floor elevation on building pads, uh, you know, even though the finished floor elevation just says a 553.79, but it may have actually worked out to be a 553.8, you know, just a hundredth off. But you know, you need to note that there has been a change.
SPEAKER_01
Who's capturing this during the course of the project? Is that your crew? Or is that inspectors?
SPEAKER_00
My crew, the surveyors, you know, it's it's it's an accumulation of people, whoever you have working for you to achieve these goals. But my crew knows you know when they set a manhole or they set a fire hydrant, they give me invert elevations, they give me top of casting elevations, they give me footage elevations between one manhole and the other, and you know, they may also, you know, say that a manhole is X amount of feet off this building corner and X amount of feet off this fire hydrant. You know, just whatever that takes to get those ass belts, and then we bring them in the house. We take the original EOR drawings, we transfer our data over on them in a real life scenario, we submit them to the municipality, the owner, uh, you know, whoever needs to have those, most of the time they go back to the original engineer of record. He updates his drawings and then he submits them to like the municipality or the owner. See these are the changes everybody approves them, they sign off on at that point. That's when we write our letter of warranty.
SPEAKER_01
Okay. And that how do you know when these be included in your letter of warranty?
SPEAKER_00
Well, just like you know, it's pretty standard. You know, it's like based off of drawings and and start time of this date, based off of drawings supplied by such and such, such and such, we comply that all materials, labor, will be warranted for one day from completion date. Whatever that completion date is, it doesn't matter what time that my scope of work is finished, when that building or that structure happens to be complete, I may finish mine six months before the building's ever complete. When a building's complete at that point, they get a UNO. When they get a UNO, then which is use use and occupancy.
SPEAKER_01
Okay.
SPEAKER_00
That's the the local government and everybody signed off on it saying that this building has been built, infrastructure has been put in, per spec, per code, you are now able to use this facility. When they get that release, that is their completion date. So our warranty starts at that date. For one year, anything goes wrong with our work, we have to be able to go in, whether it be if it happens to be some kind of failure in the product we put in, then a manufacturer will also step in and they will cover the cost of that repair. Just
SPEAKER_01
reimbursement.
SPEAKER_00
Just reimbursement. But if it's something that we've done, as far as labor goes, then we have to supply the materials, labor, and equipment to make those repairs. And if we have to disturb new pavement or asphalt, concrete, whatever, we've got to cover that as well. But that's part of our warranty.
SPEAKER_01
But I mean, there's a point, right, where you could go down this legal rabbit hole and you could say, okay, well, this is also gonna cause us this delay in traffic's gonna cost us 20% production or 20% sales on this day, and they say uh you'll also have to cover our daily expenses for half a day or one day. I mean, do you ever get to that level of warranty, or is it purely to fix the
SPEAKER_00
times, but it's it's very, very seldom. You know, most of the time the the owner is just happy that you're willing to go in and and and correct any mistakes that you've made or any faults that you may have, and plus it builds a good reputation with you and them on the next project. You're like, you know, hey, we want to continue to use these guys because they stand behind their product. You know, regardless of whatever the issue is, they're gonna come back and make it right. And that's what you want to do. You've got to have those relationships. You know, if you're constantly taking advantage of owners and and not doing or giving 100%, 110%, then you know, you're not gonna do work for those people in the future.
SPEAKER_01
Right. And
SPEAKER_00
as you build those relationships and they know you do good quality work, you may not have to be the lowest bidder. You you may be five, six, seven percent higher, but they're like, hey, we've used these people in the past and they're top-notch. I'd rather pay a little more money as I had to go through the headache with somebody else with
SPEAKER_01
it. Could end up being cheaper in the office.
SPEAKER_00
Yeah. So that's that's why it's very important to do your best work, even if it costs you money in the end. You know, be willing to go back and fix your mistakes and correct those because it's just gonna it's gonna pay dividends in the future.
SPEAKER_01
You've got your punch list items, you've got your warranty, anything else that's required to close out that job.
SPEAKER_00
No, that's pretty much it. You know, it's you know, once you have your warranty letter and your punch list items are met, then they know the job's complete, and they know you've done what you said you're gonna do. And like I said, you got one year that you've got to honor that warranty. And we've had situations, you know, like 13, 14 months down the road, they call us a hey, I know it's out of your warranty. We've got this issue, and nine times out of ten, we go back and we at least split the cost with them.
SPEAKER_01
Yeah.
SPEAKER_00
Or sometimes we'll eat all the costs, depending on what it may be.
SPEAKER_01
Well, even on a personal level, that doesn't feel good, right? Like the day after your warranty runs out, your shit breaks, you
SPEAKER_03
maybe back. It just doesn't feel good. Yeah. You didn't mention anything about cold beer. When does that take place at the end of the job?
SPEAKER_00
When that job is done and complete, and you know you don't have to go back, then there's a lot of cold beer.
SPEAKER_03
Okay. I was just curious.
SPEAKER_01
Do you have a ritual or um something you do to cap off a successful project?
SPEAKER_03
Insurance is sent, received, and accepted. Is that when you t shh.
SPEAKER_00
Is that okay? but no, I mean it's it's not really a ritual. It's like you want to get to the point to where you do quality work and it's expected. You know, it's not like, oh yes, you know, this this turned out good. It's like you know
SPEAKER_03
celebrated beer.
SPEAKER_00
Like,
SPEAKER_03
we pulled this up and overdid it. a code here. Yeah.
SPEAKER_00
You know, and and always be willing because you know, you know, we we may bid the projects, we may oversee them, but your guys in the field are the ones that's getting the quality work. They're the ones doing it.
SPEAKER_03
Yeah.
SPEAKER_00
Always be willing to go out, you know, give give a little bonus. You know, if a job goes well and everything comes in at budget or under budget, give a little bonus. You know, tell you guys how good a job they've done. You know, give them a pat on the back, take them out to eat, you know, you'd be surprised how far that goes. That makes them willing to go above and beyond on the next project.
SPEAKER_03
Yeah.
SPEAKER_00
And, you know, let's be realistic. It don't matter how good or how great your management staff is, if your field guys aren't confident in you and feel like they're appreciated, you're gonna get secondary work.
SPEAKER_03
Yeah.
SPEAKER_00
But if if they know that you appreciate them and you got their back, and you're willing to give them just a little bit to show your appreciation, they're gonna go above and beyond on each project.